The Support Network

Five days is the ignition. This is the engine.

A workshop that ends on Friday changes very little by itself. What changes a business or an organisation is what happens across the twelve, fifteen or eighteen months that follow — the coaching, the clinics, the peer group, the person you can call when it breaks.

Seven ways support continues

What the network actually provides.

Each of these runs on a published cadence with named people attached. None of them is a mailing list.

Mentorship

A named person who knows your context and stays with you through the cycle.

Mentors are matched after the intensive, once we know what a participant is actually building. A match is a working relationship with a defined focus and cadence, not an introduction — and it is reviewed at each adoption checkpoint so a match that is not working can be changed without anyone losing face.

Monthly one-to-one, plus asynchronous contact between sessions

Learn more

Volunteering

Specific, supervised roles — from a two-hour task to a full cycle.

Volunteering here is scoped work with a named supervisor, not general goodwill. Every role has a written description, a time commitment, a screening step proportionate to the access it carries, and an explicit statement of what is out of scope.

From one-off micro-tasks to sustained roles across a full cycle

Learn more

Community forums

Convened conversations where the agenda is set by the people in the room.

Forums are scheduled, facilitated and minuted. They exist so that what participants learn does not stay locked inside one cohort — and so that Ubuntu Gale hears what is not working while there is still time to change it.

Quarterly practice forums, plus listening sessions at each cycle boundary

Learn more

Workshops & clinics

Short, practical sessions on one specific thing you are stuck on.

Clinics run between the intensive and the adoption review, when the gap between a working prototype and a system someone relies on becomes obvious. They are hands-on: you leave with the thing built, not with notes about building it.

Fortnightly implementation clinics during the coaching window

Learn more

Ad-hoc working sessions

Ask for help when you need it, not when the calendar allows it.

Real implementation problems do not wait for the next scheduled date. Any participant can request a working session; requests are triaged within two working days and either scheduled, answered directly, or explained if they fall outside what the network can offer.

On request, triaged within two working days

Learn more

Peer learning circles

Small groups of people solving the same problem at the same time.

Circles of four to six participants meet without a facilitator present after the first two sessions. The design is deliberate: the goal is a support structure that survives the end of the programme, and a group that only ever meets with staff in the room will not.

Fortnightly for the first six months, then self-organising

Learn more

Alumni practice network

What happens after month 12, 15 or 18.

Completing a cycle ends the formal programme, not the relationship. Alumni keep access to forums and the resource library, are first in line to become mentors, and are the people we ask when we need to know whether something worked two years later.

Ongoing, with an annual practice gathering

Learn more

Month by month

Exactly when support happens.

These are the same phases published in each programme roadmap, seen from the participant’s side rather than the delivery team’s. Dates move; the sequence does not.

Small Business Digital Foundations

UG-SBDF · 12-month cycle

Five days of building, then eight months of clinics and coaching while the work goes into the business, then verification and handover.

  1. Pre
    One-to-one coachingBaseline conversation

    Where the business actually is before anything changes — so improvement can be measured rather than asserted.

  2. M1
    Five-day intensiveFive-day intensive

    Business Outcome Canvas, Digital Readiness Diagnostic, Five-Day Action Charter and the working artefacts built across the week.

  3. M1
    Evidence gateDay 5 completion gate

    At least 80% attendance, all critical artefacts, a safe working demonstration and an approved 90-day adoption plan.

  4. M2
    Implementation clinicFirst implementation clinic

    The first fortnightly clinic, held when the gap between the workshop build and daily operation first becomes visible.

  5. M2
    Peer circlePeer circle forms

    Four to six businesses at a similar stage, meeting fortnightly.

  6. M3
    One-to-one coachingMonthly coaching begins

    A named coach working on this business's specific adoption plan.

  7. M4
    Implementation clinicClinics continue

    Fortnightly, focused on whatever is blocking adoption this month.

  8. M5
    Community forumCross-cohort practice forum

    What is working and what is not, across every business in the cycle.

  9. M6
    Adoption reviewSix-month adoption review

    Is the system in use? If not, why not — and what would have to change.

  10. M8
    WorkshopRemediation workshop

    For businesses where adoption has stalled. Attending is not a failure; it is the point of a 12-month cycle.

  11. M10
    Adoption reviewAdoption verification

    Independent check that what was built is still in use and still owned locally.

  12. M11
    Evidence gateOutcome evidence review

    Evidence assessed against the published ladder before any public claim is made.

  13. M12
    HandoverExit and handover

    Documentation, ownership and support routes transferred. Alumni network access begins.

Community Technology Catalyst

UG-CTC · 15-month cycle

Co-design before the intensive, a prototype built during it, then nine months of organisational strengthening around whoever has to run it.

  1. Pre
    Community forumCo-design sessions

    The organisation defines the problem before anyone proposes a technology.

  2. M1
    One-to-one coachingOrganisational baseline

    Capacity, systems and the realistic amount of change this organisation can absorb.

  3. M2
    Five-day intensiveFive-day intensive

    Two to three representatives per organisation build the Technology Catalyst Decision Pack.

  4. M2
    Evidence gatePrototype acceptance gate

    Critical acceptance criteria pass or carry approved treatment. The prototype remains explicitly labelled non-production.

  5. M3
    Implementation clinicConfiguration clinics

    Turning a labelled prototype into something the organisation can safely operate.

  6. M4
    One-to-one coachingMonthly organisational coaching

    Working with the person who will actually run the system, not only the person who attended.

  7. M6
    Community forumDelivery network forum

    Organisations, delivery partners and technology contributors in one room.

  8. M7
    Adoption reviewMid-cycle adoption review

    Whether the organisation owns the system, or whether it still depends on us.

  9. M9
    WorkshopData and safeguarding workshop

    Handling of beneficiary information, consent and retention, before the system holds real records at scale.

  10. M11
    Implementation clinicSustainability clinic

    Cost, maintenance and what happens when the person who runs it leaves.

  11. M13
    Adoption reviewAdoption verification

    Independent check on use, ownership and safeguards.

  12. M14
    Evidence gateOutcome evidence review

    Evidence assessed against the published ladder.

  13. M15
    HandoverHandover and exit

    Full documentation, supplier handover checklist and ongoing network access.

Digital Skills in Practice

UG-DSIP · 18-month cycle

Two delivery cycles with a corrective learning gate between them, built around team challenges and individual portfolios.

  1. Pre
    One-to-one coachingLearner baseline and access check

    Device, connectivity and language needs established before a cohort is planned — not discovered on day one.

  2. M2
    Five-day intensiveCycle 1 intensive

    Teams of four to six build toward the Team Challenge Delivery Pack.

  3. M2
    Evidence gatePortfolio integrity gate

    Version history, source and AI-use disclosure, and no prohibited data or production dependency.

  4. M3
    Peer circleTeam practice circles

    Teams continue meeting between formal sessions.

  5. M4
    WorkshopEmployer-led workshop

    Practitioners describing what the work actually looks like, and reviewing portfolio quality.

  6. M5
    One-to-one coachingMentor review begins

    Mentor review of portfolio quality against published criteria.

  7. M7
    Community forumLearner forum

    What is helping, what is not, and what the second cycle should change.

  8. M9
    Adoption reviewProgression review

    Where each learner is against the evidence ladder, and what would move them up it.

  9. M12
    Evidence gateCorrective learning gate

    A formal decision point: what the first cycle got wrong, and what changes before the second runs.

  10. M13
    Five-day intensiveCycle 2 intensive

    The revised design, delivered to the second group.

  11. M16
    WorkshopProgression and referral workshop

    Portfolios, referrals and employer introductions — with no guarantee of employment attached.

  12. M17
    Evidence gateOutcome evidence review

    Evidence assessed against the published ladder across both cycles.

  13. M18
    HandoverCompletion and alumni entry

    Individual portfolio case studies finalised. Alumni network access begins.

Months 18–36

And after the cycle ends.

Completing a cycle ends the formal programme, not the relationship. The extended track is optional, and it runs on the principle that the people best placed to help the next cohort are the ones who have already done it.

01

Months 18–24

Consolidate

Quarterly check-ins and access to clinics while the system beds in beyond the coaching window. The question at this stage is durability, not novelty.

  • Quarterly adoption check-in
  • Clinic access on request
  • Forum participation
02

Months 24–30

Contribute

Alumni who have run a system for two years know things no facilitator can teach. This stage moves them from receiving support to giving it — as mentors, workshop contributors or case-study subjects.

  • Mentor onboarding, if they choose it
  • Contribute a practice case study
  • Peer circle facilitation
03

Months 30–36

Extend

Longitudinal evidence collection. This is where a claim about lasting outcomes becomes defensible — because there is three-year data behind it rather than an exit-survey response.

  • Longitudinal outcome interview
  • Independent verification, where consented
  • Ongoing network membership

What we commit to

The network asks for your time. Here is what it owes you.

A real role, not a waiting list

If we cannot offer you a defined role with a supervisor, we will say so rather than hold your details indefinitely.

Induction before you start

Nobody is placed with a participant before they have been through boundaries, escalation and the code of conduct.

A named person to raise concerns with

Every role has a supervisor, and a route past that supervisor if the concern is about them.

Your time is not wasted

Sessions are prepared, participants are briefed, and a cancellation reaches you as early as we know about it.

Expenses are not a barrier

Agreed travel and data costs are reimbursed. Ask before you incur them and the answer will be clear.